Installation Preparation Guide
Installation Preparation Guide
Technical Support
About This Guide
Chapter 1 Introduction and Checklist
Chapter 1 Introduction and Checklist
What happens during VCC Installation?
Virtual Command Center Pre-Installation Requirements
Chapter 2 Site Preparation and Installation Overview
Chapter 2 Site Preparation and Installation Overview
Site Preparation
Site Installation
VCC Installation
What's After Installation?
Chapter 3 Rack and Rack Mounted Equipment
Chapter 3 Rack and Rack Mounted Equipment
Specifications and Placement
Analog Modem Line Installation
Chapter 4 Power Requirements
Chapter 4 Power Requirements
Power Requirements
Power Installation
Chapter 5 VCC Network
Chapter 5 VCC Network
Overview
VCC Network Specifications
Reliability Considerations
Diagrams of Example Networks
Chapter 6 Connectivity Interfaces
Chapter 6 Connectivity Interfaces
Types of Equipment that can be connected
Cabling requirements
Device Interface Preparation - Mainframe Coax
Device Interfaces Preparation - Controllers
Device Interface Preparation - OS Consoles
Hardware Console attached by Coax
Defining the NIP Console(s) and System Console(s)
AS/400 Device 6141 Setup
RS/6000
MVS Console Models/Colors - CBUS and/or EBUS
Setting up HCD, CONSOLxx, and the VCC system.cfg File for Color Support
MVS Mainframe Console Operation
Missing Interrupt Handler (MIH) Problem with MVS
VTAM 327x console/terminal
Non-Mainframe System Consoles
Chapter 7 Preparation of User Interfaces
Chapter 7 Preparation of User Interfaces
Global Watch Station Overview
Placement
User Account Info
Chapter 8 VCC Rack Installation
Chapter 8 VCC Rack Installation
Assumptions
General Requirements and Information
Equipment Installation Steps